Saving Seafood

  • Home
  • News
    • Alerts
    • Conservation & Environment
    • Council Actions
    • Economic Impact
    • Enforcement
    • International & Trade
    • Law
    • Management & Regulation
    • Regulations
    • Nutrition
    • Opinion
    • Other News
    • Safety
    • Science
    • State and Local
  • News by Region
    • New England
    • Mid-Atlantic
    • South Atlantic
    • Gulf of Mexico
    • Pacific
    • North Pacific
    • Western Pacific
  • About
    • Contact Us
    • Fishing Terms Glossary

Feds push to keep Vineyard Wind paused as 10 turbines stand bladeless

January 27, 2026 — Federal officials on Jan. 21 asked a Massachusetts court to uphold the government’s halt to construction at Vineyard Wind 1’s offshore project, which has left 10 turbines partially built — called a “hammerhead” status for each turbine — with towers and nacelles installed, but no blades.

Court filings show the $4.5 billion project is 95% complete, weeks from finishing, and incurring millions in daily costs.

In separate submissions to the court and the federal Bureau of Safety and Environmental Enforcement, Vineyard Wind 1 has pushed for the go-ahead to install the missing blades, saying that leaving the turbines in “hammerhead” status for too long increases safety, structural and operational risks and leaves components exposed to corrosion, fire hazards, and potential marine debris. The stop-work order, however, does not allow new construction.

Read the full article at The Enterprise

MASSACHUSETTS: Seventeen months on, Vineyard Wind blade break investigation isn’t done

December 4, 2025 — Sixty-two towers. Sixty-two nacelles. One-hundred eighty-six blades.

Those are the pieces that comprise Vineyard Wind, an 800-megawatt offshore wind project nearing completion after more than two years of construction.

By The Light’s accounting, the project has two towers and two nacelles left to ship out from the Port of New Bedford. That leaves the blades — an estimated 33 of which, as of last month, have yet to top some turbines, and an unknown number that may still need to be removed and replaced.

As batches of blades have traveled across the seas, to and from New Bedford, France, and Nova Scotia, and been installed on turbines, the U.S. Bureau of Safety and Environmental Enforcement has continued to investigate what caused one of the blades to fail in July 2024.

In January 2025, the Biden administration ordered Vineyard Wind to remove all blades manufactured at a factory in Gaspé, Quebec, where the broken blade was built. BSEE gave Vineyard Wind permission to finish construction using blades from a different factory in Cherbourg, France.

Read the full article at the The New Bedford Light

Recent Headlines

  • Debate grows over NOAA plan to expand snapper access
  • FAO study estimates 20 percent of seafood is subject to fraud
  • FLORIDA: ‘It’s our resource’: Florida’s East Coast could see longest Red Snapper season since 2009 in 2026
  • LOUISIANA: More than 900 Louisiana restaurants cited for violating new seafood labeling law in 2025
  • NOAA Fisheries opens public comments on state-led recreational red snapper management, renewing concerns of overfishing
  • Falling in Love with Farmed Seafood February 12, 2026
  • Messaging Mariners in Real Time to Reduce North Atlantic Right Whale Vessel Strikes
  • US House votes to end Trump tariffs on Canada

Most Popular Topics

Alaska Aquaculture ASMFC Atlantic States Marine Fisheries Commission BOEM California China Climate change Coronavirus COVID-19 Donald Trump groundfish Gulf of Maine Gulf of Mexico Illegal fishing IUU fishing Lobster Maine Massachusetts Mid-Atlantic National Marine Fisheries Service National Oceanic and Atmospheric Administration NEFMC New Bedford New England New England Fishery Management Council New Jersey New York NMFS NOAA NOAA Fisheries North Atlantic right whales North Carolina North Pacific offshore energy Offshore wind Pacific right whales Salmon South Atlantic Virginia Western Pacific Whales wind energy Wind Farms

Daily Updates & Alerts

Enter your email address to receive daily updates and alerts:
  • This field is for validation purposes and should be left unchanged.
Tweets by @savingseafood

Copyright © 2026 Saving Seafood · WordPress Web Design by Jessee Productions